Become the first-class high pressure fluid control expert in the world

Suncenter  >  AI - Page Sitemap  >  Suncenter energy saving gas pressure test for industry
Suncenter energy saving gas pressure test for industry

Suncenter energy saving gas pressure test for industry

MOQ
1 Set
Brand Name
SUNCENTER
Certificate
ISO/CE/SGS
Warranty
13 Months
Packaging
By Plywood case
Shipping Port
Shenzhen/Hongkong
Payment
T/T,Western Union,Credit card.
Transaction method
EXW,FOB,DDP,CIF,CFR
Place of Origin
Guangdong Province, China (Mainland)
Delivery Time
Within 10-15 working days after received deposit
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:

Introduction


Suncenter energy saving gas pressure test for industry-1
  • The safety valve test bench is a new type of pressure test device developed by our company for reference to GB/T 12242-2005 (pressure release device and performance test specification), which is used to adjust and test the setting pressure of the safety valve.


Function and features


Safety valve test bench is used for various safety valve setting pressure adjustment, the whole set pressure detection, discharge pressure detection, back seat pressure testing, assessment of its pressure safety performance etc.. ,


  • A. pressure range: 0-480 bar for option(gas pressure and water pressure)

  • B. test medium: air, nitrogen, water;

  • C. test valve diameter: DN15-DN400 for option

  • D. pressure control accuracy: less than 1%F.S;

  • E. pressure measurement accuracy: 0.4 pressure gauge (optional higher pressure level);

  • F. Clamping way: hydraulic cylinder clamping;

  • G. station interface type: screw and flange type

  • H. clamping force output range: 0-50 tons;

  • I. supply voltage: 50Hz -60Hz ,220V/380V for option

  • J.Size:1500×1200×900mm(machine) +1500×800×800mm(clamping device)


Control panel


Suncenter energy saving gas pressure test for industry-2


Clamping seat


Suncenter energy saving gas pressure test for industry-3


Schematic diagram


Suncenter energy saving gas pressure test for industry-4


Instruction for software control part


Suncenter energy saving gas pressure test for industry-5
  • Figure 1

  • The first step: start the computer and double click the boot program, as shown in Figure 1.

  • The second step:  after the program, enter the main interface of the program.


Suncenter energy saving gas pressure test for industry-6
  • In the main interface, select the appropriate sensor, and pay attention to the selection of the sensor not to exceed the 2/3. of the measuring process ,as shown in Figure3


Suncenter energy saving gas pressure test for industry-7
  • In the main interface, choose water pressure test or air pressure test. As shown in Figure 4.


Suncenter energy saving gas pressure test for industry-8
  • After selecting the pressure or water pressure test, click the menu bar test information to set the options. As shown in Figure 5.


Suncenter energy saving gas pressure test for industry-9
  • Display the dialog box for the test information, as shown in Figure6


With printer,could print the testing report directly.

Suncenter energy saving gas pressure test for industry-10
Suncenter energy saving gas pressure test for industry-11


Suncenter energy saving gas pressure test for industry-12
  • Safety valve test bench SVT40-DN400-CC computer control model


video





Regarding the quality management of Suncenter safety valve test bench, it is demanded to pass through the extremely harsh quality control and inspection required for gift and crafts.
Suncenter safety valve test bench is professionally created under a strong design team who has excellent computer ability such as Autocad, Solidworks, CAD, and CAM.
The production processes of Suncenter gas pressure test are strictly done according to the hardware tools&accessories industry, including the paint spraying, electroplating, or polishing based on different needs.
Suncenter safety valve test bench is made by using the following techniques: laser metal cutting, CAD software, precision welding, CNC milling and drilling, and powder coat painting.
The production procedures of Suncenter gas pressure test include shaping, firing, glazing, and re-firing. All of these workmanships are done by skilfully technicians who have many years of experiences in porcelain.
This product can last for decades. Its joints combine the use of joinery, glue, and screws, which are tightly combined with each other.
Product Message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...