Become the first-class high pressure fluid control expert in the world

The axial plunger pump commissioning

by:Suncenter     2020-08-08
The axial plunger gas booster pump 1 - the phone is switched on 2 hours check by temperature, pressure, sound is normal. Please note that the following items: plunger pump end of commissioning. Check the power supply has a good grounding of the commissioning before. Validation plunger gas booster pump power supply voltage and the wiring is correct. 2 confirm piping, pump parts, pressure gauge, safe valve without exception ( There may be damaged due to transportation of) Two oil 1 confirm piston pump base oil pool clean. Oil grades according to the oil standard oil indicate position, 2 to infuse lubricant base oil pool. Different type plunger pump use lubrication. Stick to a between high and low oil level. Hydraulic end flange screw moderation ( About 530 n. M do not force too big, loose the screw for the various parts inspection plunger gas booster pump. In case a crush 'position' check motor coupling, electric contact pressure gauge, electric equipment is normal. 4 check the attachment. The upper limit of five electric contact pressure gauge whether regulation in 1. 1 times the rated pressure value. Six commissioning the electric contact pressure gauge instructions in 1. Under 1 times the rated pressure value, the suction pipe, large open valve on the discharge pipe to the position. High-pressure pump safe valve is normal. Before start the host. Open the host. 1 it is strictly prohibited in the case of close the inlet valve. 2 medium oil tank surface position is normal. Motor starting. 3 press the starting switch. 4 check the motor to correct. Check the presence of abnormal noise, 5 after startup. Parts with and without loose, the seal leaks. 6 to see whether it has instructions in the rating pressure table values. High pressure pump in daily operation note 1 entrance pressure gauge indicating value is normal. To be found as early as possible accident. Note 2 voice and presence of abnormal vibration. Lubricating oil and the screw loose. 3 note leaks medium. Seven stop machine halt. 1 press the stop button. First close the suction line valve, 2 after downtime. After the discharge line valve. 3 temporary downtime ( More than three months) Ought to work even after temporary downtime: 1 the lubricating oil discharge clean; 2 cut off power supply; Will the heat leakage corrosion high-pressure pump) 3 to close near heating ( Temporary storage. 4 dust ( On the whole machine with plastic film cover) High-pressure pump temporarily shut down after running should be paid attention to matters such as the resistance is lower than 2 m Ω, 1 to determine the insulation performance of the machine. Should be dry disposal; 2 wash stand with kerosene pool ( Dump the kerosene after cleaning them up) 3 according to the new boot (other Refer to the 4) operation Disposal; Keywords: oil pump power plant, the axial plunger pump manufacturers, variable plunger pump manufacturers
Suncenter is the leading manufacturer of gas booster and related products.
All of the experts Dongguan Suncenter Fluid Control Equipment Co., Ltd consulted stressed that the best recovery plans are the ones made before you need them, not afterward.
Dongguan Suncenter Fluid Control Equipment Co., Ltd provides a way for you to understand your customers, to learn what makes them unique and what motivates their behavior. We can then leverage that wealth of information to personalize our interactions and demonstrate that gas booster is valuable to our customers.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...